Multi-Select
Select multiple tasks at once in Plan Builder to run bulk actions with confidence.
What is Multi‑Select?
- select many: Choose multiple rows at once from the selection column or ID column
- clear feedback: Selected rows show a blue background with a left blue border
- bulk actions: Run operations (indent/outdent, link, duplicate, delete, add subtasks) on all selected
Why use Multi‑Select?
- speed: Perform common edits across many tasks in a single step
- consistency: Apply the same structure (indent/outdent) or relationships (link) uniformly
- control: Review what’s selected via clear row highlights and the selection count in the toolbar
How selection works
Methods
- Click checkboxes: Click the checkbox in the first column to toggle a row in/out of the selection.
- Marquee (drag) selection: Start a drag in the selection column or the
IDcolumn to select all rows the box intersects.- Hold Ctrl/Cmd before dragging to add to the current selection.
- Dragging is ignored when starting on interactive elements (inputs, buttons, etc.).
- Select all visible: Click the header checkbox to select or clear all rows currently visible (respects filters).
Notes:
- Shift‑click range is not supported. Use marquee selection for ranges.
- Clicking on the empty background (not on a row) clears the current selection.
- Right‑clicking an unselected row will select it first, then open the context menu.
Visual feedback
- Row styling: Selected rows are highlighted with a subtle blue background and a blue left border.
- Toolbar count: The toolbar shows the number of selected rows and includes Clear Selection.
Plan Builder specifics
- Header checkbox: Selects/clears all rows currently shown in the table (after search/filters). It does not select hidden or unloaded rows.
- Hierarchy: You can select parent and child rows together. Selection applies to visible rows only; collapsed children aren’t selected.
- Calendar: The Calendar view is read‑only and does not support row selection.
Bulk actions
- Indent / Outdent:
- Keyboard: press
Tabto indent,Shift+Tabto outdent the selection. - Also available from the context menu.
- Keyboard: press
- Link tasks:
- Links selected tasks in their current display order (top → bottom): first → second → third, etc.
- Creates a simple chain using predecessors.
- Duplicate: Creates copies of all selected rows.
- Delete: Removes all selected rows (and their visible descendants when applicable).
- Add subtask(s):
- Adds one subtask under each selected non‑milestone row.
- Subtasks are limited to a single nesting level.
- Insert N tasks above/below:
- When a selection exists, the context menu shows actions to insert that many tasks relative to a target row.
Tips & troubleshooting
- If drag selection doesn’t start, begin the drag from the selection column or the
IDcolumn, not in the middle of a data cell. - If select‑all doesn’t catch some tasks, check if filters are active; select‑all applies only to currently visible rows.
- Linking follows the grid’s display order, not the order in which you clicked rows.
- Calendar view is read‑only: make selections and edits in the Plan grid.
Last updated: 2025-10-24